September Update
I have been super busy lately, with alot of other things, but I have completed some stuff, so im happy. Still alot to do though.
The previous list, with updated statuses:
Projects I am working on:
- Flight Sim HOTAS Setup: I finished assembly of the first one back before June. It turned out slightly better than I was expecting, but its not the most perfect box.
-'07 BMW 335i Coupe: Picked it up in Munich, drove it for 8 days there, dropped it off, and picked it up in Chicago!
- New web page: No change! Probably going to shelve this.
Things I need to do:
-Re-floor the foyer in the house
-Test DI-624 upstairs for WIFI, and reinstall a Netgear hub downstairs under the TV: Done, but bought a 5 port gigabit switch for downstairs instead.
-Sort paid bills
-Rip CDs to Mac iTunes: 2/3rds done, ran out of HD space!
-Buy new hard drive for the computer "Mylene" and install Windows XP on it: DONE! 500GB goodness!
-Spring Clean Garage:
- Tear down boxes that bed frame came in to recycle: DONE!
- Sort through boxes from moving BEFORE JULY! DONE!
- Eventually Paint garage, BEFORE JULY!: uh, lets move that to Winter! haha
- Empty extra recycle bin of old weeds into paper bags to get rid of, Then clean the extra bin BEFORE JULY!: Ditto
- Tile (Plastic) Garage? If at all, before July.: Ditto
So, the new list is as follows:
Projects I am working on:
- Flight Sim HOTAS Setup: Need to modify design for 3/4s inch plywood, and create a second HOTAS stand. 1st one assembled, and needs to be sanded and painted.
Things I need to do:
-Repair/Glue picture frame
-Sort paid bills
-Move the 60GB disk to the Mac
-Rip CDs to Mac iTunes: 2/3rds done, ran out of HD space!
-Paint garage, BEFORE Winter sets in
-Tile (Plastic Tiles) Garage floor
-Empty extra recycle bin of old weeds into paper bags to get rid of, then clean it
-Re-floor the foyer in the house

0 Comments:
Post a Comment
<< Home